AIR FLIGHT TECHNICAL LLC

Copyright 2014. Air Flight Technical LLC. All Rights Reserved.

​Paperwork and Engineering Generated

   

   Certification Plan

   Conformity Plan

   Flammability Test Plan and Results

   Structural Verification Report - G2

   Structural Verification Report - G4B

   Structural Test Plan and Results - G4B

   Approval 8110-3 for all above

   Electrical Loads Analysis Report

   RFC - Detailed Parts G2

   RFC - Detailed Parts G4B

   RFC - Assembly  G2

   RFC - Assembly G4B

   RFC - Installation G2

   RFC - Installation G4B

   Function Test Plan and Results G2 and G4B

   TIA - Inspection Report

   ICA Instructions for Continued Airworthiness

​   EWIS Report


​STC - G2 and G4B Galleys for 757-200

STC Project Managment